HEAVY INDUSTRIAL
Project case study
Client
CBCH Crane Hire
Market / Industry
Heavy Industrial
Project
Wind Tower Turbine Blade Lift, Whyalla Wharf
Description
MAX Services partnered with CBCH Crane Hire at the Whyalla wharf to unload 68.5m long wind tower turbine blades onto specialised transport for delivery to the Lincoln Gap Wind Farm located between Port Augusta and Whyalla.
MAX used a Grove GMK 5180 180 tonne mobile crane for the blade lift.