HEAVY INDUSTRIAL
Project case study
Client
Adelaide Brighton Cement
Market / Industry
Heavy Industrial
Project
Adelaide Brighton Cement Shutdown, Birkenhead
Description
MAX Services assisted Adelaide Brighton with their annual plant shutdown, the project also included refurbishment work on their Accolade II limestone carrying ship.
95t Liebherr LTM1095-5.1 and 250t LTM1250-6.1 mobile cranes were used to work on the Accolade ship and cement plant, assisted by our AT20 and MAC 25 Frannas to complete a dual lift installation of some new duct work.
All work was planned, conducted and completed safely.