OIL & GAS
Project case study
Client
Santos
Market / Industry
Oil & Gas
Project
Removal of obsolete Communications Tower.
Description
MAX Services assisted Santos with the removal of an obsolete communications tower.
The tower was 49 metres high and located in an adjoining section of both the plant and the main access to the camp causeway. The removal work was completed safely and on time.
MAX used a 130 tonne Liebherr LTM 1130-5.1 crane for the project and worked in conjunction with other Santos contractors.