WIND & RENEWABLES

Project case study

Client

Vestas

Market / Industry

Wind & Renewables

Project

Gearbox Exchange at Lincoln Gap Wind Farm.

Description

MAX Heavy Lift Team completed a gearbox exchange at the Lincoln Gap wind farm near Port Augusta. The Liebherr LTM11200-9.1 was utilised to exchange a 35t gearbox on a wind turbine generator with a 110m hub height.

The crane was configured in a unique wind power duty T88 T7YVEV2NZF with 122t of counterweight.

Tip Height in this configuration is 126.6m with a lifting capacity of 44t at a 24m radius.

+61 8 8641 3955