HEAVY INDUSTRIAL

Project Case Study

Client

Oz Minerals

Market / Industry

Heavy Industrial

Project

Main Shaft Exchange, Prominent Hill.

Description

MAX was engaged to complete an 80 tonne main shaft exchange of the Gyratory Crusher during a planned crusher shutdown at the Prominent Hill Mine Site.

MAX engaged external engineers to undertake a geotechnical assessment to ensure that the crane was positioned safely.

Comprehensive inspections were undertaken to complete detailed Cad Lift Plans to ensure that the risk to the client’s operations was minimised.

A detailed project timeline was developed to ensure all stakeholders worked together.

+61 8 8641 3955